2.5MW wind turbines with 103m rotors to power four Polish wind projects

Paul Boughton
GE will supply 38 wind turbines for four wind projects in construction in Northern Poland. When operational, these projects, referred to collectively as Darlowo Wind Energy Centre—Phase Two (Darlowo—Phase Two), will mark the first use of GE’s 2.5-megawatt class wind turbines that feature 103-metre rotors for high productivity in Poland.

Invenergy Wind LLC (Invenergy) and Polish development company Enerco sp. z o.o. (Enerco), are collaborating to develop nine wind energy generation projects in the region in and around Darlowo, near the Baltic Sea. GE provided 32 wind turbines for Darlowo—Phase One, which was fully commissioned in March 2011 and today produces 80 megawatts of power. Darlowo—Phase One is comprised of the Weikowice, Jezyce and Dobiesław projects.

Darlowo—Phase Two, comprised of the Boryszewo, Krupy, Stary Jarosław and Nowy Jarosław facilities, will bring the total installed capacity of wind energy in the Darłowo area to 175 megawatts.

Darlowo—Phase Three will consist of two additional projects—Gorzyca and Pekanino—which currently are under contract. These sites will boost the aggregate output of the nine Darlowo projects to 250 megawatts.

GE’s 2.5 series wind turbines offer high efficiency and reliability for a broad range of wind conditions. Built on the proven performance of GE’s 1.5-megawatt wind turbine, the world’s most widely deployed machine in the wind industry with more than 16,500 units installed worldwide, the 2.5-megawatt wind turbines with a 103-metre rotor will help the Darlowo projects provide increased energy capacity while maintaining required levels of efficiency, reliability and grid-connection capabilities.

The wind turbines for the Darlowo—Phase Two will be assembled at GE’s facility in Salzbergen, Germany. Commercial operation of the turbines is to commence in the fourth quarter of 2012.
 
For more information, visit www.ge.com