|
|||
![]() |
BP Chemicals has invested £20million in a refurbishment project at its acetic acid production plant in Hull, UK. One element of the upgrade to the steam reformer is the installation of six Servomex2700 combustion gas analysers and a manual calibration and control panel, which have contributed to reduced fuel consumption and savings of £500000 per year (Fig.1). |
||

