Valve upgrade for natural gas plant

Louise Davis

The Great Island power station in County Wexford owned/operated by SSE plc is a 464 MW combined cycle gas turbine (CCGT) plant that was first commissioned in 2014. Acknowledged as one of Ireland’s cleanest and most efficient natural gas power stations on the country’s national grid, the plant generates enough energy to power the equivalent of half-a-million homes.

In 2016 the operators identified improvements that could be made in the heat recovery steam generator (HRSG) plant to improve efficiency and long-term asset management. The improvements involved the introduction of Master/Martyr valve sets on the high, intermediate and low-pressure turbine drain valves.

Turnkey project
The upgrade, involving the replacement of existing valves, installation of new valves, installation and commissioning of a total of 30 new actuators and integration with the existing control system, was programmed to take place during a three-week outage period. Rotork Site Services was awarded a turnkey contract to carry out all the work within this challenging timescale.

Rotork Site Services’ responsibilities encompassed:

  •   System design, product selection and procurement
  •   Design of control system and integration with existing Mitsubishi programmable logic controller    (PLC)
  •   Installation of power, control and instrumentation cabling and cable containment
  •   Commissioning and site training
  •   Project management

Plant upgrades were performed in 30 areas comprising six continuous blowdown valves, six intermediate blowdown valves and 18 turbine drain valves. Valve adaption was designed and fabricated for the installation of 30 Rotork IQ non-intrusive intelligent electric valve actuators. These were specified with local plug-and-socket assemblies to facilitate removal and replacement if overhauls are required in future outages.

Padraig Dunleavy, Great Island CCGT station manager, comments: “We have worked closely with Rotork UK and Rotork Site Services for many years, utilising them at many of our plants in the UK including Fiddlers Ferry, Ferrybridge and Keadby. We are fully aware of their capabilities for meeting strict deadlines on major plant upgrades such as the one proposed for Great Island.

“Rotork was very professional and gave us full confidence for the timely outcome of the project, from the initial site survey through project management, installation and system integration. This confidence is reinforced by the long history of reliability demonstrated by the actuators installed on SSE sites.”

The double-sealed and non-intrusive actuators are designed to withstand hazardous and environmentally challenging operating conditions often encountered in the power generation industry. Secure, non-intrusive set-up and data transfer eliminates the need to remove electrical covers for commissioning once the actuator is site wired. This feature permanently protects internal components from the time the new actuator leaves the factory, enhancing the long-term reliability of the robust double-sealed enclosure design. In addition, IQ intelligent actuation technology incorporates powerful datalogging abilities, enabling operating data to be downloaded and diagnosed for the optimisation of plant performance, preventative maintenance and asset management.

Successful completion
The project was successfully completed on time and to the satisfaction of the SSE engineers. Rotork is also offering a comprehensive Client Support Programme (CSP) to support over 100 of its products on the site and further enhance the reliability and availability of the actuation assets.?

Sarah Kellett is with Rotork. www.rotork.com

 